PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing metal Decking as well as safety cables and poles at Derrick -3 (3rd Floor) Facing North(800x600).jpg Installing shear wall panels at Elev. 1,2,3 (3rd Floor) Facing South-East (800x600).jpg Started installing the grease interceptor at Room 105 (Servery) Facing East (800x600).jpg Installed shear wall panels at Elev. 1,2,3 (3rd Floor) Facing South-East (800x600).jpg
Previous pageNext page Started installing the grease interceptor at Room 105 (Servery) Facing East (800x600)
Started installing the grease interceptor at Room 105 (Servery) Facing East (800x600)